18禁无码AV免费不卡,成人a影片免费在线播放,亚洲AⅤ无码一区二区波多野,毛片基地a久久国产精品,午夜一级无码福利视频

Infrastructure Under-construction on PPP Basis – National Highway G206
ACEG Invest.  |  Updated: 2018-01-30  |  Views: 37285

The National Highway G206 Shucheng Section is with a length of 23.1KM starting from the Interchange Overpass named Shuqing in Shucheng County and ending at the boundary with County Tongcheng .

The designed speed is 80km/h for the main road with a width of 24.5m and 60km/h for the urban trunk road with a width of 32m.

The initial shareholder of this project is Tongyun Transportation Construction Investment Co., Ltd. in Shucheng County, accounting for 20% of the shares and the social capital - Anhui Construction Engineering Group Co., Ltd. accounting for 80% of the shares.

The total investment of the project is RMB 840 Million Yuan and the construction cost is RMB 688.5 Million Yuan. The total construction period is 18 months and the operation period is 10 years.

The project commenced in January 2017 and the scheduled completion date will be in July 2018.

 

永济市| 京山县| 交城县| 临澧县| 寿阳县| 元江| 太仆寺旗| 德钦县| 县级市| 高陵县| 宣威市| 饶阳县| 象山县| 巧家县| 和田市| 胶州市| 阜康市| 汉川市| 太白县| 都匀市| 广西| 垫江县| 武汉市| 大渡口区| 凤阳县| 横山县| 竹溪县| 沾益县| 法库县| 昌都县| 庐江县| 绥芬河市| 土默特左旗| 文成县| 奈曼旗| 永德县| 沽源县| 天等县| 贵阳市| 桦甸市| 崇阳县|

<span id="py1xd"><listing id="py1xd"></listing></span>

    <label id="py1xd"><big id="py1xd"><tbody id="py1xd"></tbody></big></label>

  1. <li id="py1xd"></li>
    <rt id="py1xd"><delect id="py1xd"><style id="py1xd"></style></delect></rt><li id="py1xd"><legend id="py1xd"></legend></li>