18禁无码AV免费不卡,成人a影片免费在线播放,亚洲AⅤ无码一区二区波多野,毛片基地a久久国产精品,午夜一级无码福利视频

Infrastructure Under-construction on PPP Basis – National Highway G206
ACEG Invest.  |  Updated: 2018-01-30  |  Views: 37285

The National Highway G206 Shucheng Section is with a length of 23.1KM starting from the Interchange Overpass named Shuqing in Shucheng County and ending at the boundary with County Tongcheng .

The designed speed is 80km/h for the main road with a width of 24.5m and 60km/h for the urban trunk road with a width of 32m.

The initial shareholder of this project is Tongyun Transportation Construction Investment Co., Ltd. in Shucheng County, accounting for 20% of the shares and the social capital - Anhui Construction Engineering Group Co., Ltd. accounting for 80% of the shares.

The total investment of the project is RMB 840 Million Yuan and the construction cost is RMB 688.5 Million Yuan. The total construction period is 18 months and the operation period is 10 years.

The project commenced in January 2017 and the scheduled completion date will be in July 2018.

 

宁国市| 济源市| 兴安县| 巴东县| 岚皋县| 繁峙县| 综艺| 黄梅县| 泰来县| 筠连县| 蒲江县| 安化县| 杭锦旗| 柳州市| 壶关县| 青河县| 彝良县| 武川县| 同仁县| 蓝田县| 松原市| 上蔡县| 望城县| 肥城市| 噶尔县| 靖远县| 凭祥市| 乌拉特前旗| 双峰县| 怀来县| 嘉峪关市| 平邑县| 咸丰县| 延庆县| 兴宁市| 昌吉市| 桑日县| 确山县| 香格里拉县| 庆城县| 平乐县|

<span id="py1xd"><listing id="py1xd"></listing></span>

    <label id="py1xd"><big id="py1xd"><tbody id="py1xd"></tbody></big></label>

  1. <li id="py1xd"></li>
    <rt id="py1xd"><delect id="py1xd"><style id="py1xd"></style></delect></rt><li id="py1xd"><legend id="py1xd"></legend></li>